Assembly and operating instructions - David 3
Here is a link to the Assembly video, assembly instruction manual and an operating guide for the David 3 loom, all provided by Louët.
David 3 assembly instructions and video
The tie up cords are 16cm long and should have exactly 11 loops. Always use the last useable loop on each end - one end slides over the lam and the other end slips over the screw head on the treadle.
If you are interested in looking at prices or purchasing a David 3 loom, click the buy now button below
Last updated
Was this helpful?