Assembly and operating instructions - David 3

Here is a link to the Assembly video, assembly instruction manual and an operating guide for the David 3 loom, all provided by Louët.

David 3 assembly instructions and video

The tie up cords are 16cm long and should have exactly 11 loops. Always use the last useable loop on each end - one end slides over the lam and the other end slips over the screw head on the treadle.

If you are interested in looking at prices or purchasing a David 3 loom, click the buy now button below

Buy Now

Last updated

Was this helpful?